Hamina LNG

Type: Gas

Country: Finland

Customer: Resolum OY / Hamina Energia OY / Gasgrid Finland OY
Cost: 1,8 MEUR
Project finalization date: 02.09.2021

  • Connection between Hamina LNG terminal and Finnish main gas grid.
  • High and Low pressure gas pipe installation,
  • Installation of 3 Line valve stations, pipe bending, horisontal drilling under bay, pipeline totally 8 km