Type: Gas
Country: Finland
Customer: Resolum OY / Hamina Energia OY / Gasgrid Finland OY
Cost: 1,8 MEUR
Project finalization date: 02.09.2021
- Connection between Hamina LNG terminal and Finnish main gas grid.
- High and Low pressure gas pipe installation,
- Installation of 3 Line valve stations, pipe bending, horisontal drilling under bay, pipeline totally 8 km